We are entering an exciting era of smart use of energy. Everyone of us can play a part – big or small – in combating climate change. Sign up for our renewable energy schemes today and build a sustainable future together.

What is Renewable Energy Feed-in Tariff?

To watch the full version about Renewable Schemes, please click here.

You can take part in the scheme by installing a solar and/or wind power renewable energy system on your premises. Once the system is successfully connected to the CLP grid, you can earn FiT payments. 

Benefits

CLP will buy the electricity generated by your renewable energy system at a FiT rate and the amount will be reflected in your regular electricity bills.

FiT Rates 

Three types of FiT rates will be offered according to the generation capacity of your renewable energy system:

Capacity of the Renewable Energy System

FiT Rate^ 

(per unit of electricity – kWh)

≤ 10kW

HK$5

> 10kW to ≤ 200kW

HK$4

> 200kW to ≤ 1MW

HK$3

^ The rates listed above are effective from 1 October 2018 onwards and will be reviewed regularly.

Eligibility

You can take part in this scheme if:

  • You are a registered CLP account holder (not applicable to government bodies)
  • Your renewable energy system is powered by solar and/or wind and is located on your premises with a total generation capacity of up to 1MW
  • Your renewable energy system can be connected to the CLP network without any increase in capacity or network reinforcement work by CLP 

Application Process: We Make the Process Simple

Step 1

Complete the Electronic Application Form and Upload Required Documents

Step 2

Technical Assessment, System Test and Installation before CLP Smart Meter Installation

Step 3

Completion and Grid Connection

You are reminded to ensure the design, installation, operation and maintenance of your renewable energy system comply with all applicable laws, regulations, guidelines, safety and technical requirements.

Application Methods

To apply, simply complete the electronic application form on the CLP website or CLP App and upload required documents.

Please prepare required documents and information before your submission.

  1. A copy of HKID Card, Passport or Business Registration Certificate (as applicable) for identity verification purposes
  2. Preliminary layout diagram of renewable energy system (sample)
  3. Preliminary renewable energy system information and single-line electrical diagram (sample)

The application receipt date will be counted on the date we received your application form and all the above required documents.


Important Notes and Terms and Conditions (PDF)

Technical Guidelines

You or your assigned contractor/engineering contact should read through all of the below guidelines to ensure your systems meets all the requirements in order to facilitate a smooth and successful application.

  1. Technical Design Notes for Grid Connection of Small Renewable Energy Systems (This document outlines the design requirements and considerations for inverter-based RE Systems with generation capacity of up to 1MW and non-inverter-based RE Systems with generation capacity of up to 200kW.) 
  2. Grid Connection Requirements (This document sets out the general technical requirements for the parallel connection of the customer’s RE Systems connecting to the CLP’s 11kV or 380V system.)
  3. Feed-in Tariff Scheme Standard Metering Requirements (This document sets out the requirements for the location, accommodation and operation of FiT Meters and electricity revenue meters for the purposes of the FiT Scheme.)
  4. Operation Procedure Template (for Renewable Energy Systems) A template with examples of what to include in the operation procedures to be submitted.
  5. Testing and Commissioning Template (for Renewable Energy Systems) A template with examples of what to include in the testing and commissioning report to be submitted.
  6. Sample of renewable energy system preliminary layout diagram
  7. Sample of preliminary renewable energy system information and single-line electrical diagram



Monitor your Renewable Energy System Smartly 

From 1 October 2018 onwards, you can monitor your system on the CLP website or App to view the amount of electricity generated hourly. 

Contact Us

For details, please contact us by the following channels:

Tel:  2678 0322

Email: [email protected]

Through your Account Manager if you are our Large Power Tariff or Bulk Tariff Customers

And you may submit enquiry eForm below:

For more information on renewable energy systems including a list of equipment suppliers, please contact the Electrical and Mechanical Services Department. 

6395 2930

Frequently Asked Questions about Renewable Energy Feed-in Tariff

If you have further questions, please click here to check out the answers.

To download the PDF file of the Feed-in Tariff (FiT) Scheme leaflet, please click here.

For customers who are keen on installing small renewable energy systems but not register for the Renewable Energy Feed-in Tariff Scheme or electricity generated by renewable sources other than solar / wind, you can still connect the system to CLP grid. Please click here for details. 

Loading

Feedback
Close popup

Your Feedback

We appreciate your feedback which helps us to constantly improve our site. Please rate your experience.

Thank you!

System error. Please try again later.

Back To Top