It is important to recognise that in the power transmission process, both CLP and its customers have their specific areas of responsibility, per the demarcation below:
CLP’s jurisdiction
- Generation equipment
- Overhead lines
- Underground cables
- Substations/Transformers
Users’ jurisdiction
- The main switch and other switchgear in switching rooms
- Rising mains and switchgear in buildings
- Meter rooms on individual floors
- Switch boxes and circuit breakers