Dual Master’s Degree (MPhil and MSc)

About this programme

Jointly launched by CLP Power Academy, the Hong Kong University of Science and Technology (HKUST) and the University of Strathclyde (UoS) in the UK, it is the first part-time Dual Master's Degree programme in Hong Kong co-developed between local and overseas universities and the industry to provide engineers or engineers-to-be a path to enhance their knowledge and learn future skills.

Integrating applied research and professional practice through application of latest innovation and technologies, the programme offers students an in-depth understanding of power engineering domain knowledge in future energy and power systems smart operation and management as well as application of various data science technologies.

The UoS Master's Degree programme is delivered through online distance learning. Students under the HKUST Master's Degree programme will be guided by academic supervisors from the HKUST and industry advisors from CLP Power or related companies, and will apply new technologies for real-life thesis projects including:

  • Big Data Analytics
  • Internet of Things
  • Artificial Intelligence
  • Machine Learning, etc.

Academic and Professional Qualifications

  • Master of Philosophy Degree (from the HKUST) and
  • Master of Science Degree (from the UoS)

More information

Please refer to our programme leaflet (PDF) or HKUST's programme details.

DM timeline
Duel Master poster

Students' Sharing

The Dual Master's Programme not only helps us learn about new technologies, such as AI, but also inspires us to apply them to overcome engineering challenges at work. I would recommend this programme to anyone who is interested in electrical engineering and the latest technologies.

CLP Power Academy at A Glance

Contact us 

If you have any enquiries, please call 2678 0611 or email clp.power.academy@clp.com.hk.

Back to top